EMAIL admin@hed-electrical.co.uk

Call +44 (0) 1375 386 256

Completion of PH neutralization plant

17

December, 2017

By Pete Langdown

Recently we have installed a new PH neutralization plant for one of our major clients. Due to the aggressive nature of the environment the installation had to be carried out using all stainless steel containment and using non-corrosive isolators and flexible conduits. The installation was carried out over a very tight project period as the equipment was a direct replacement for an older obsolete system.

  • gallery image
  • gallery image
  • gallery image
  • gallery image
  • gallery image
  • gallery image
  • gallery image
  • gallery image
  • gallery image
  • gallery image