The complete detailed precision fit out for a fitness centre inclusive of all of the male and female locker room, changing facilities, WC and showers within the FPB building these works were carried out to a high and exacting standard. The lighting installation was carried out utilising LED lights with presence detection unit fitted to insure a cost effective and ecologically sound installation. All lighting levels have been designed to CIBSE lighting guide.
The complete detailed precision fit out for a fitness centre inclusive of all of the male and female locker room, changing facilities, WC and showers within the FPB building these works were carried out to a high and exacting standard. The lighting installation was carried out utilising LED lights with presence detection unit fitted to insure a cost effective and ecologically sound installation. All lighting levels have been designed to CIBSE lighting guide.